Commercial Systems
Domestic Systems
Garden Systems
About Us
Wholesale and reselling
News
Links
Contact Us
Discussion Forum
Privacy Policy
Terms of Business
Site Map

Commercial rainwater harvesting projects

Education Sector - selected projects only

Industrial : Commercial : Public sector : Leisure : Residential

Project Name Sutton St. Nicholas P.S.   Project Name Burgate School & 6th Form
Client W&R Edwards Ltd   Client ACV- Hinchcliffe Ltd
Location Hertfordshire   Location Hampshire
Tank Size 15,000L GRP   Tank Size 12,000L GRP
Control type Direct pressure   Control type Header tank
Filter type/size A-class   Filter type/size VF-1
Date supplied December 07   Date supplied November 07
Estimated mains displaced 306M3 per year   Estimated mains displaced 240M3 per year
         
Project Name MANCAT   Project Name Lowerstoft Colleage
Client Gtr. Manchester LEA   Client Suffolk LEA
Location Manchester   Location Lowerstoft
Tank Size 45,000L GRP   Tank Size 12,000L GRP
Control type Duo direct pressure   Control type Direct pressure
Filter type/size VF-6   Filter type/size VF-2
Date supplied November 05   Date supplied May 06
Estimated mains displaced 918M3 per year   Estimated mains displaced 250M3 per year
         
Project Name Library   Project Name AMRC
Client Portsmouth University   Client Bowmer & Kirkland
Location Portsmouth   Location Sheffield
Tank Size 30,000L GRP   Tank Size 12,000L GRP
Control type Header tank   Control type Header tank (duo pumps)
Filter type/size VF-2   Filter type/size VF-2
Date supplied August 06   Date supplied October 07
Estimated mains displaced 600M3 per year   Estimated mains displaced 250M3 per year
         
Project Name Pinewood School   Project Name Training Centre
Client Hants CC   Client Hull College
Location Farnborough   Location Hull
Tank Size 27,000L GRP   Tank Size 12,500L GRP
Control type Header tank   Control type Header tank
Filter type/size VF-4   Filter type/size VF-2
Date supplied July 07   Date supplied June 07
Estimated mains displaced 580M3 per year   Estimated mains displaced 285M3 per year
         
Project Name Torriano School   Project Name 5th Avenue School
Client LEA   Client LEA
Location Kentish Town   Location Hull
Tank Size 12,000L GRP   Tank Size 5 no, 6,500L PE tanks
Control type Header tank   Control type Direct pressure (4no.)
Filter type/size VF-2   Filter type/size VF-2 (2no)
Date supplied May 07   Date supplied October 07
Estimated mains displaced 285M3 per year   Estimated mains displaced 300M3 per year
         
Project Name Millbrooke School   Project Name Plasmawr School
Client LEA   Client LEA/GEE Construction
Location Swindon   Location Cardiff
Tank Size 4,700L PE   Tank Size 25,000L GRP
Control type Header tank   Control type Header Tank
Filter type/size Integrated   Filter type/size VF-1
Date supplied November 08   Date supplied July 09
Estimated mains displaced TBC   Estimated mains displaced 520M3 per year
         
Project Name Maplefields School   Project Name William De Ferrers School
Client Briggs and Forrester   Client Essex Mechanical
Location Corby   Location Essex
Tank Size 37,000L GRP   Tank Size 16,000L GRP
Control type Header tank   Control type Header Tank
Filter type/size VF-4   Filter type/size VF-2
Date supplied May-11   Date supplied Jun-10
Estimated mains displaced 755M3 per year   Estimated mains displaced 327M3 per year
         
Project Name Ingoldmells Primary School   Project Name LICA Building - Lancaster Uni
Client Kier Marriott   Client Morgan Ashurst
Location Skegness   Location Lancaster
Tank Size 12,000L GRP   Tank Size 28,000L GRP
Control type Direct pressure   Control type Header Tank
Filter type/size VF-1   Filter type/size VF-2
Date supplied Jun-10   Date supplied Sept-10
Estimated mains displaced 235M3 per year   Estimated mains displaced 560M3 per year
         
Project Name Writhlington School   Project Name Chryston High School
Client Lorne Stewart   Client McCallum Water Heating
Location Radstock   Location Livingston
Tank Size 10,500L   Tank Size 80,000L GRP
Control type Header tank   Control type Header Tank
Filter type/size Twin   Filter type/size VF-6
Date supplied Nov-10   Date supplied June-11
Estimated mains displaced 214M3 per year   Estimated mains displaced 1,632M3 per year
         
Project Name Bolton College   Project Name Jesse Boot School
Client Smith Group   Client Shepperd Engineering
Location Bolton   Location Nottingham
Tank Size 60,000 L GRP   Tank Size 50,000L GRP
Control type Twin inverter driven set   Control type Header Tank
Filter type/size VF-6   Filter type/size VF-6
Date supplied Jun-09   Date supplied May-10
Estimated mains displaced 1220M3 per year   Estimated mains displaced 1,100M3 per year
         
Project Name Bordesley Green School   Project Name The Peaks Centre
Client Dodd Group   Client Wheatleys
Location Birmingham   Location Sheffield
Tank Size 2400L PE   Tank Size 5,200L PE
Control type Header tank with booster   Control type Combi-booster
Filter type/size Internal   Filter type/size Internal
Date supplied Jul-10   Date supplied Jul-11
Estimated mains displaced 50M3 per year   Estimated mains displaced 106M3 per year
         
Project Name Brownhills Academy   Project Name Montsaye Community College
Client Keyline Builders Merchants   Client Dodd Group
Location Stoke on Trent   Location Northants
Tank Size 60,000L   Tank Size 11,000L GRP
Control type Header tank   Control type Header Tank
Filter type/size VF-6   Filter type/size VF-1
Date supplied Apr-11   Date supplied Nov-11
Estimated mains displaced 1,225M3 per year   Estimated mains displaced 225M3 per year
         

Many projects are seeking BREEAM credits and as part of our service, we can provide those calculation on request.

Industrial : Commercial : Public sector : Leisure : Residential









spacer  
Rain harvesting logo