Commercial Systems
Domestic Systems
Garden Systems
About Us
Wholesale and reselling
News
Links
Contact Us
Discussion Forum
Privacy Policy
Terms of Business
Site Map

Commercial rainwater harvesting projects

Industrial Sector - selected projects only

Education : Commercial : Public sector : Leisure : Residential

Project Name
AMRC Waverley
  Project Name Estuary point, Business Park
Client EL-WHS   Client Birchalls Ltd
Location Sheffield   Location Liverpool
Tank Size 12,000L GRP   Tank Size 35,000L GRP
Control type Header tank (duo pumps)   Control type Duo direct pressure
Filter type/size VF-6   Filter type/size VF-3
Date supplied Oct-07   Date supplied Sept-07
Estimated mains displaced 245M3 per year   Estimated mains displaced 715M3 per year
         
Project Name St Pauls Church Bus. Park   Project Name New Factory
Client Armitage Construction   Client Loadhog Lids
Location Scouthead   Location Sheffield
Tank Size 12,000L GRP   Tank Size 12,000L GRP
Control type Header tank control system   Control type Direct Pressure System
Filter type/size VF1   Filter type/size VF-2
Date supplied Sept-07   Date supplied Jul-04
Estimated mains displaced 240M3 per year   Estimated mains displaced 250M3 per year
         
Project Name Distribution Centre   Project Name Hawks Creative Bus. Park
Client 3663 Transport   Client SCS
Location Harlow   Location York
Tank Size 59,000L Concrete   Tank Size 12,000L
Control type Header tank control system   Control type Direct pressure system
Filter type/size C-Class Filter   Filter type/size VF-1
Date supplied Aug-05   Date supplied Sept-07
Estimated mains displaced 1,200M3 per year   Estimated mains displaced 220M3 per year
         
Project Name Factory   Project Name Factory
Client William Armes   Client Ampy Metering
Location Sudbury   Location Market Deeping
Tank Size 9,000L GRP   Tank Size 75,000L GRP
Control type Direct pressure system   Control type Duo direct pressure system
Filter type/size VF-2   Filter type/size VF-4
Date supplied Jul-07   Date supplied Jul-07
Estimated mains displaced 190M3 per year   Estimated mains displaced 1700M3 per year
         
Project Name Dunelm Mill Stoke   Project Name Factory
Client Dunelm Mill   Client Argivert Ltd
Location Staffordshire   Location Radford
Tank Size 10,000L GRP   Tank Size 10,000L PE Above ground
Control type Direct pressure system   Control type Duo direct pressure system
Filter type/size VF-4   Filter type/size Twin
Date supplied 07/10   Date supplied 06/10
Estimated mains displaced 180M3 per year   Estimated mains displaced 150M3 per year
         
Project Name Fertiliser Store   Project Name Research Facility
Client Clark Construction   Client Coorigenda
Location Immingham   Location Salisbury
Tank Size 84,000L Sectional Above Ground   Tank Size 18,000L GRP
Control type Direct pressure system   Control type Duo direct pressure system
Filter type/size A5000   Filter type/size Twin
Date supplied 03/09   Date supplied 01/10
Estimated mains displaced 16,400M3 per year   Estimated mains displaced 275M3 per year
         

Education : Commercial : Public sector : Leisure : Residential









spacer  
Rain harvesting logo